|
Deposit 1101 5538 0 50% total inclusions: 10% pottery, 10% tile, 20% pebbles to cobbles (fine to coarse pebbles, rounded to angular, spherical to platy), 10% boulders Top slope of the context is level ... third quarter of the 13th c ... block of gypsum (0.17m x 0.26m x 0.15m) and another of green schist (0.15m x 0.24m x ... sgraffito II, slipped painted ... II, slipped painted |
| Basket/zembil 941 52 111 NB941 P111 B052 Lot 2001-042 Fill in well Cooking ware. 1 rim PRS (saved to lot) .; Cooking ware. 2 rims frying pan profile (base to rim) (saved to lot) .; Fineware. 15 pre-Roman ... 2001/06/05 ... 3rd c. A.C. |
Basket/zembil 81 90 238 Trench S III, south extension We have struck so many walls and stones that it becomes impossible for us to proceed deeper without destroying something.
So I am stopping here ... LH III ... NB81 B90 P238 |
Basket/zembil 84 150 96 Trench X II, east extension II 0.40-0.60
A good many pieces of Greek tiles. Some Corinthian sherds (they are characteristic). A few LM III one or two LM II 3 Minyan and ... 1916/07/11 ... NB84 B150 P96 |
Basket/zembil 84 52 41 House P, "altar" Photographs CWB film J (J) exp. 7 – 10
7) Baetyl and pebble mound from SE 1/50 d 8
8) “ “ “ “ “ SSE 1/50 d 11 [MN: CWB 129]
9) ... 1916/06/16 ... approximately square 1.10 x 1.10 m. ...
Tzonou-Herbst=Blegen 1921, p. 62, fig. 86, ... House P, "altar" |
Basket/zembil 83 1 1 South/connecting wall [House M: connecting wall LE and west wall, 0-35 (NB 83 B 1), cf. Plan pp. 2-3]
Began work with 4 men. Began by digging a trench eastward from the center partition ... 1916/05/29 ... Blegen 1921, p. 108, fig. 133, ... [House M: connecting ... 2-3]
Began work with 4 men. |
| Basket/zembil 941 67 126 NB941 P126 B067 Lot 2001-042 Fill in well -18.30 m. to - 18.60 m. below mouth Fineware. 18 unid r.s. (saved to lot) .; Fineware. 3 body sherds, 4 bases ESB (saved to lot) .; Fineware ... 2001/06/20 ... NB941 B67 P126 |
Cut 1101 5353 0 Structure materials: limestone, rough cut. Material size: 0.33 m W x 0.25 m H x 0.30 L l. Material finish: roughly hewn. Material construction: rough face, random, uncoursed. Material bonding: ... 2008/05/05 ... Structure materials: limestone, rough cut. Material size: 0.33 m W x 0.25 m H x ... Section G. Notebook 230, p. 157, notes that the 3 |
|
|