|
Room 8 [N: 1088.00 N, S: 1077.00 N, E: 129.00 E, W: 121.00 E]
Room 7 [N: 1086.30 N, S: 1078.20 N, E: 123.90 E, W: 119.40 E]
Rodríguez-Álvarez, Emilio
Session III
Introduction:
This is the final report ... 877 and 845, see NB 845 p. ... between 23rd and 25th of April ... 121.85-123.25 E, cf. Burr and Rogers, |
Stephanie Kimmey and Jennifer LaFleur
Session 1
TESE Excavations, NW Passage
N: 1073.00 N; S: 1058.07 N; E: 108.91 E; W: 94.00 E
April 7-May 3, 2014
This is the final summary of excavation ... 83G; B. 81, NB 839, p. 139); ... (NB 880, p. 79), a second ... p. 62-77), and modern |
Mohammed Bhatti and Daniel P. Diffendale
Team Pink, Session 1
Nezi Field Excavations Final Report
N 1006 – 1018.00; E 261.01 – 271.28
1–25 April 2013
This is a final summary of the first season of excavation ... Daniel P. Diffendale
Team ... Mohammed Bhatti and Daniel P. ... 1018.00; E 261.01 – 271.28
1–25 |
During the first training session of the 2008 season, we conducted excavations for fifteen days between April 7 and April 23, 2008.We worked with Thanasis Notis (pickman), Billy Papanikolao (shovelman), ... 229, p. 143; the foundation ... +/- 25 CE. This all seems |
An Jiang, Catharine Judson
2016 Corinth Session I
South Stoa Excavation, Shop 1 Rear
Coordinates: N: 1092.3, S: 1084.7, E: 355.9, W: 349.6
Excavation Dates: April 5-21, 2016
Introduction
This is ... Greek sherds” (p.116). On ... Classical/Hellenistic [Corinth P/T?], 1 coin ... (NB 139, p.122), and |
Temple E, Southeast Excavations 2017
Coordinates: N: 1043.270, S: 1039.866, E: 114.763, W: 109.937
This is the final summary report for work undertaken in the northeastern corner of the courtyard of Unit ... 849, p. 41). The clay floor ... exposed to the elements for 25 |
N-S 1074.64-1071.50; E-W 125.50-122.70
Session 2-3 Final Report, June 27, 2014
This is the final report of the second and third sessions during the 2014 excavations in the church nave in Unit 2 of the ... 835, B62, p. 111-112; burial ... 123.31-122.25 W) built into it. The ... (1073.63-1072.22 N, 123.25-123.05 E) is |
Sarah Lima
Session 3
End of Season Report
15 June, 2009
Between the dates of May 25, 2009 and June 15, 2009 (Session III), our excavation team comprised of Sarah Lima (recorder), Panos Kakouros (pickman), ... Nezi Field 2009 by Sarah Lima (2009-05-25 to 2009-06-15) |
|
|