|
Sarah Rous, Rebecca Worsham
Session I
Temple E Southeast Excavations
N: 1087 N, S: 1075.25 N, E: 129 E, W: 116.5 E
6–25 April 2014
Introduction
This is the final summary of the first session of excavation ... 153 (1081.41–1085.81N ... Southeast Excavations
N: 1087 N, S: 1075.25 N, E: 129 E, W: |
Final Report: Excavations of South Stoa, Shop 1 Rear, Session 2 2016
Alexandra Daly and Thalia Parr
DATES OF EXCAVATION: May 4-20 2016
COORDINATES: N: N 1090.40; E: E 353.95; S: N 1084.70; W: E 349.60 ... 2016
COORDINATES: N: N 1090.40; E: E 353.95; S: N ... the east (N: N 1106.51, E: |
Kate Larson and Jon Meyer
ASCSA Corinth Excavations
Blue Team Session 3 Final Report
N :1016.50 N, E: 263.00 E, S: 1005.70 N, W: 255.50 E
May 27 – June 18, 2013
During Session 3 2013, the Blue Team excavated ... 1006.08 N. At the preserved ... -S 1006.91-1005.81 N, E-W 258.23-257.15 E, ... Final Report
N :1016.50 N, E: |
Stephanie Kimmey and Jennifer LaFleur
Session 1
TESE Excavations, NW Passage
N: 1073.00 N; S: 1058.07 N; E: 108.91 E; W: 94.00 E
April 7-May 3, 2014
This is the final summary of excavation ... modern water pipe is 5.81m ... Excavations, NW Passage
N: 1073.00 N; S: 1058.07 N; E: |
Bram ten Berge, Katerina Ragkou
Session II
Temple E Southeast Excavations (TESE)
N: 1071.69 S: 1058.97 E: 103.11 W: 94.50
May 5, 2014 – May 26, 2014
Introduction
This is the final summary of the ... , while its height is 0.68 m. ... Southeast Excavations (TESE)
N ... modern water pipe (1073.00 N |
Katherine Harrington, Jana Mokrišová
Team Blue, Session 1
Nezi Field Excavations
N: 1017.20 N, S: 1006.90 N, E: 263.50 E, W: 255.50 E
1-25 April, 2013
This is the final summary of the first session of ... Excavations
N: 1017.20 N, S: 1006.90 N, E: 263.50 E, W: ... NB 262, 1015.90N) to the |
Maggie Beeler, Morgan Condell
Session 1
Temple E, Southeast Excavations
N-S 1074.64-1071.50; E-W 126.00-122.70
April 2014
This is the final summary of the first session of excavation in 2014 in the Temple ... 47, N-S 1072.81 ... Southeast Excavations
N ... N-S 1075.11-1074.52, E-W |
Alison Fields and Jessica Lamont
Team White, Session 3
Nezi Field Excavations Interim Report
Area 1: N-S 1016.05-1011.70, E-W 274.18-278.91
Area 2: N-S 1009.51-1005.94, E-W 278.90-271.47
May 27-June 14 ... at H 86.28 m. in ... began at H 87.21 m. in ... 1.34 m. D, the fill of this |
|
|