EXCAVATION SUMMARY
Six weeks ago, on April 10, 2007, we, Lydia Herring, Josh Langseth, and Kris Lorenzo, opened an excavation area at the extreme north of the Nezi field under the supervision of Guy Sanders, ... minimum diameter of 0.90 m. ... 0.5 m.
At the bottom of ... excavation covered ca. 160 m |
INTRODUCTION
In the past three weeks, we, Lydia Herring, Josh Langseth, and Kris Lorenzo, opened an area at the extreme north of the Nezi field under the supervision of Director of Excavation Guy Sanders ... m long, 0.57 m in width, ... height of 0.55 m above ground ... (B51=B58=B59). These tiles extend |
Excavation Summary
During the third training session of the 2007 season, we, J. Matthew Harrington and Theodora Kopestonsky, conducted excavations in the area north of the Nezi field for a total of fourteen ... Nezi north B5001 to B ... entire area (B5002, B ... strata (B5088, B5090, B |
Kelly E. O’Connor and Catherine A. Uritis
Corinth 2022 Session II (5/9/22- 5/27/22)
27 May 2022
Northeast of Theater, Trench 19B, Session II Final Report
Elevations of Identified Road Levels in 19B South ... Northeast of Theater 2022, Trench 19B, by O’Connor, Kelly E. and Uritis, |
Corinth Report: Northeast of Theater excavations, Trenches 15B and 14B, by Taylor Cwikla, Allisen Hunter (May 9 – May 27)
Collection: Corinth
Type: Session Summary
Context: NET Context 26, NET Context ... Northeast of Theater 2022, Trench 15B and 14B, by Cwikla, Taylor and Hunter, |
Danielle Smotherman
Temple E, Southeast Excavations
Session I
Unit 2, Room 2
N: 1066.50 N, S: 1065.00 N, E: 119.27 E, W: 116.57 E
Unit 2, Room 9
N: 1086.73, S; 1079.10 N, E: 132.85 E, W: 126.83 E
21-28 ... 0.9 m, W. 1.35 m). Shortly ... 0.29 m) with cobbles, tiles, ... (1066.60 N, 118.17 E, L. 1.6 m |
Luke Madson and Jesse James, Session III 2022 (May 30 - June 24)
Excavation Summary:
This excavation took place from May 30 to June 17, 2022, during the third excavation session of the season. It continued ... from NET 16 B. The ... B (directly adjacent to ... layer. 1.74m of the drain’s |
This is the final report for the area excavated by the green team in Temple East – Southeast during the first session of excavation of 2014. Guy Sanders (director) and Jody Cundy (field director) supervised ... approximately 3.5m wide (NB 859, B ... approximately 3.5m wide, according to ... south (NB 859, B14, 58; p. |
|
|