[Corinth Report] Northeast of Theater 2022, Trench 19B, by O’Connor, Kelly E. and Uritis, Catherine A. (2022-05-09 to 2022-05-27): NET Trench 19B, Session II Final Report

Kelly E. O’Connor and Catherine A. Uritis Corinth 2022 Session II (5/9/22- 5/27/22) 27 May 2022 Northeast of Theater, Trench 19B, Session II Final Report Elevations of Identified Road Levels in 19B South ... NET Trench 19B, Session II Final Report

[Corinth Report] Temple E, Southeast 2014 by Larkin Kennedy and Jody Cundy (2014-05-06 to 2014-06-27): Sessions 2-3 of 2014: Church Nave, Unit 2 of the Frankish Quarter

N-S 1074.64-1071.50; E-W 125.50-122.70 Session 2-3 Final Report, June 27, 2014 This is the final report of the second and third sessions during the 2014 excavations in the church nave in Unit 2 of the ... 0.18 to 0.08 m long and 0.13 ... 835, B62, p. 111-112; burial ... and measure 0.27 to 0.18 m