During the second and third sessions of the 2008 season at Corinth, a contingent of Team Green excavated to the W of a 1960s-excavated courtyard within the greater area of North of Nezi. The area of excavation ... name “Wall 5.” He excavated ... Walls 5 and 6 demonstrated that Wall 5, although |
Rachel McCleery/Sarah Miller
Nezi Field Excavations
N: 1015.90 N, S: 1006.90 N, E: 264.20 E, W: 255.50 E
April 3-20, 2012
This is a summary of the first session of excavation (April 3-20) in 2012 in the ... 5 meters west of wall ... been aimed at uncovering G ... cobbles.
5) Completion of the |
Bram ten Berge, Katerina Ragkou
Session II
Temple E Southeast Excavations (TESE)
N: 1071.69 S: 1058.97 E: 103.11 W: 94.50
May 5, 2014 – May 26, 2014
Introduction
This is the final summary of the ... 103.11 W: 94.50
May 5, 2014 ... May 5, 2014 and the final ... 5, NB 880) at an elevation |
Alison Fields and Jessica Lamont
Team White, Session 3
Nezi Field Excavations Interim Report
Area 1: N-S 1016.05-1011.70, E-W 274.18-278.91
Area 2: N-S 1009.51-1005.94, E-W 278.90-271.47
May 27-June 14 ... (5TH-6TH CENTURIES C.E.)
In the 5th-6th centuries C.E., but ... (e.g., Nezi Field 2013 Session |
Stephanie Kimmey and Jennifer LaFleur
Session 1
TESE Excavations, NW Passage
N: 1073.00 N; S: 1058.07 N; E: 108.91 E; W: 94.00 E
April 7-May 3, 2014
This is the final summary of excavation ... plate (C 2014-5). This ... up only 5% of the soil ... 83G; B. 81, NB 839, p. 139); |
We, Joseph Lillywhite, Joel Rygorsky, Matthew Sears and Martin Wells, continued excavation in the entirety of Nezi Field from May 5 – June 13th, 2008. This report will summarize our own findings, while ... Field from May 5 – June 13th, ... (e.g. 264 and 267), while ... can vary widely, e.g. 371 |
Final Report: Excavations of South Stoa, Shop 1 Rear, Session 2 2016
Alexandra Daly and Thalia Parr
DATES OF EXCAVATION: May 4-20 2016
COORDINATES: N: N 1090.40; E: E 353.95; S: N 1084.70; W: E 349.60 ... 5th-21st). After removing ... Eutresis (J. L. Caskey and E. G |
Sarah Lima
Session 3
End of Season Report
15 June, 2009
Between the dates of May 25, 2009 and June 15, 2009 (Session III), our excavation team comprised of Sarah Lima (recorder), Panos Kakouros (pickman), ... 1.5 m on its eastern side, ... possibility of contamination (e.g |
|
|