[Corinth Basket] Nezi Field, context 1050: Brown fill NW of wall 1033

Deposit 1107 1050 0 stones, pebbles, tiles, ceramics, glass, carbon, bone, iron The soil color is light brownish brown. The soil compaction is hard. The soil is poorly sorted. It is clayey silt. We begin ... 5th-6th npd ... Late Roman (5th -6th c AD)

[Corinth Basket] Nezi Field, context 929: Destruction Layer with Tile E of Wall 540

Deposit 1106 929 0 Lot 2012-047 pottery, tiles, bone, pebbles, cobbles, iron, glass, bronze; 20% inclusions Top slope of the context is slight down to the N. The soil color is light reddish brown. The ... early 7th ... Late Roman (5th -6th c AD)

icon

[Agora Object] S 312: Winged Nike: Akroterion

Missing: head, right arm just below shoulder, left arm, right leg from immediately above knee, left leg from immediately above ankle; parts of the cloak at the back gone, also the fragments of drapery ... 21 March 1933 ... 43 c-45.

icon

[Agora Publication Page] Agora 17, s. 220, p. 208

I.G.II² 9938. I.G.II² 10836. I.G.II² 12175a. S.E.G. X 441. I.G.II² 9963a. I.G.II² 10887. I.G.II² 12204a. S.E.G. X 445. I.G.II² 9974. I.G.II² 10888. I.G.II² 12205. S.E.G. X 449. I.G.II² 9988. I.G.II² 10894 ... Agora 17 208 ... S.E.G. XII 209 ... I.G.II² 10525c ... I.G.II² 13177c

[Corinth Report] Temple E, Southeast 2015 by Rodríguez-Álvarez, Emilio and Tanaka, Kurtis T. (2015-05-04 to 2015-05-31): Final Report Unit 2, Room 3. Session II.

Introduction: This is the final report for the second session of excavations of the 2015 season for Room 3, Unit II in the area of Temple E SE. In the 1990’s, Room 3 was divided by the grid system and, ... C. Keesling, while the ... 2015-182, -195, -197, -209, and

[Corinth Report] Temple E, Southeast 2014 by Bram ten Berge and Katerina Ragkou (2014-05-05 to 2014-05-26): Roads and Courtyard of NW Passage, Session 2

Bram ten Berge, Katerina Ragkou Session II Temple E Southeast Excavations (TESE) N: 1071.69 S: 1058.97 E: 103.11 W: 94.50 May 5, 2014 – May 26, 2014 Introduction This is the final summary of the ... fills (deposits 209 and 212) ... construction date. c) Continue to