icon

[Corinth Image] bw 2002 026 34

Detail of oinochoe C 2002 032 beside grave 2002 011 fr. E. after B35 ... specific view NB954 B35 P74 ... Detail of oinochoe C 2002 032 beside grave 2002 011 fr. E. after B35

icon

[Agora Image] 2012.34.0452 (Section Ζ 224)

Trench C. Layer IV gone. From southwest. 1=Propylon, 2=upper oblique wall, 3=round water pipe, 4=terracotta drain ... AMS Horizontal (normal) ... 2012.34.0452 (Section Ζ 224) ... 2012.34.0452

icon

[Agora Image] 2012.34.0493 (Section Ζ 265)

Before start, from northeast. 1: Building C, 2: Base E, 3: later Peribolos, 5: east wall of Middle Drain ... AMS Horizontal (normal) ... Before start, from northeast. 1: Building C, 2: Base E, 3: later Peribolos, 5:

icon

[Agora Image] 2012.34.0570 (Section Ζ 342)

Trench AA finished, from southwest. A = Earliest wall. B = East wall of South Archaic House. C = Base E ... AMS Horizontal (normal) ... 2012.34.0570 (Section Ζ 342) ... 2012.34.0570

icon

[Agora Image] 2012.34.0650 (Section Ζ 422)

Looking northwest across House C cleared to Strosis 5 and disturbed areas. From southeast. Curved trembled referred to / ... / as small north-south wall ... AMS Horizontal (normal) ... 2012.34.0650 (Section Ζ 422) ... 2012.34.0650

icon

[Agora Image] 2012.34.0667 (Section Ζ 439)

Steps, cleaned to strosis 6, cobbling. The northeast corner of House C revealed (x…x). Stone drain to east of it, from east ... AMS Horizontal (normal) ... 2012.34.0667 (Section Ζ 439) ... 2012.34.0667

icon

[Agora Image] 2012.34.0021 (Section Ε 742)

Eponympoi. Drain Cross Cuts A and C. Showing late water channel trench dug in Agora floor along west side of monument. From north ... AMS Horizontal (normal) ... Eponympoi. Drain Cross Cuts A and C. Showing late water channel trench dug in

icon

[Agora Image] 2012.34.0022 (Section Ε 743)

Eponympoi. Drain Cross Cuts A and C. Showing late water channel trench dug in Agora floor along west sill of monument. From south ... AMS Horizontal (normal) ... Eponympoi. Drain Cross Cuts A and C. Showing late water channel trench dug in