|
Katherine Harrington, Jana Mokrišová
Team Blue, Session 1
Nezi Field Excavations
N: 1017.20 N, S: 1006.90 N, E: 263.50 E, W: 255.50 E
1-25 April, 2013
This is the final summary of the first session of ... S1069), 0.45 m apart, rested on ... N-S 1013.60-1011.79, E-W ... (N-S 1017.17- 1014.96, E-W |
Final Report: Excavations of South Stoa, Shop 1 Rear, Session 2 2016
Alexandra Daly and Thalia Parr
DATES OF EXCAVATION: May 4-20 2016
COORDINATES: N: N 1090.40; E: E 353.95; S: N 1084.70; W: E 349.60 ... preserved in a 3.2m x 2.45m area) ... in a 1.00 x 0.50 m area) ... in a 2.60 x 0.35 m area). |
An Jiang, Catharine Judson
2016 Corinth Session I
South Stoa Excavation, Shop 1 Rear
Coordinates: N: 1092.3, S: 1084.7, E: 355.9, W: 349.6
Excavation Dates: April 5-21, 2016
Introduction
This is ... : 1092.3, S: 1084.7, E: 355.9, W ... 1106.511; S 1086.5; E 356.4; W ... Stoa, Wall 371 (L 2.5 m, W |
Kelly E. O’Connor and Catherine A. Uritis
Corinth 2022 Session II (5/9/22- 5/27/22)
27 May 2022
Northeast of Theater, Trench 19B, Session II Final Report
Elevations of Identified Road Levels in 19B South ... K. O’Connor and C. Uritis ... has a width of 1,07 m. Road ... (p.883). 19B overlaps with L 15, |
Charles George, Rossana Valente
Nezi Field Excavations
N: 1015.90 N, S: 1006.90 N, E: 264.20 E, W: 255.50 E
28 May – 22 June, 2012
This is a final summary of the third season of excavation (28th May – ... 2012 Session 3 Team Blue Final Summary |
Stephanie Kimmey and Jennifer LaFleur
Session 1
TESE Excavations, NW Passage
N: 1073.00 N; S: 1058.07 N; E: 108.91 E; W: 94.00 E
April 7-May 3, 2014
This is the final summary of excavation ... measured 1.13 x 0.40 x 0.19m ... 2, Room A (N-S ... N; S: 1058.07 N; E |
Kyle Mahoney and Rachel McCleery
Nezi Field Excavations Final Report
1015.20 to 1005.80 N, 264.30 to 277 E
May 28-June 15, 2012
This is the final report on the third session of excavation (May 28-June ... Roman (5th-6th c. AD)
Two ... to west. The 6th-7th c. ... the presence of 5th c. |
N-S 1074.64-1071.50; E-W 125.50-122.70
Session 2-3 Final Report, June 27, 2014
This is the final report of the second and third sessions during the 2014 excavations in the church nave in Unit 2 of the ... (reconstructed L ca. 1.75 m, W 0.45 ... (reconstructed L 1.98 m, actual W 0 ... (L 2.09 m, W 0.75 m, Depth |
|
|