|
Session III
Unit 2, Room 9
N: 1086.73, S: 1079.10, E: 132.85, W: 126.83
Unit 2, Room 6
N: 1085.00, S: 1077.00, E: 120.70, W: 116.85
This is the final summary of the third excavation session for 2015 in ...
1086.23, E 126.99, W 130.93), to the East ...
West ...
and the road to the east |
This is the summary of the second session of excavation in 2014 in Unit 2, Room 7, and the adjacent passage north of the church nave, in the area of Temple E Southeast (TESE). Room 7 was previously excavated ... along a roughly west-east ... west to east and cutting ... west, and by Wall 157 (1078.3 |
http://agathe.gr/publications/monographs.html Monographs Excavations in the civic and cultural center of classical Athens began in 1931 and have continued almost without interruption to the present day. The first Athenian Agora volumes presenting ... monographs online through Oxbow ... Roman through the Venetian ... commentaries. Each section on a |
EXCAVATION SUMMARY
We, Josh Gieske and Laurie Kilker, from April 11 to April 23 2008 excavated in the courtyard of the Byzantine house uncovered by the 1961 excavations in Agora SW-G, overseen by Steven ... further east, passing through ... west and north of an ... wall to the east and a |
Introduction:
This is the final report for the second session of excavations of the 2015 season for Room 3, Unit II in the area of Temple E SE. In the 1990’s, Room 3 was divided by the grid system and, ... 1058.50-1056.90N, 109.40-115.70E; East ... section of the W wall presents ... original sections. The original |
Danielle Smotherman
Temple E, Southeast Excavations
Session I
Unit 2, Room 2
N: 1066.50 N, S: 1065.00 N, E: 119.27 E, W: 116.57 E
Unit 2, Room 9
N: 1086.73, S; 1079.10 N, E: 132.85 E, W: 126.83 E
21-28 ... of the East and West walls ... sectioning the room. As part of ... 556 cuts through the |
Anna Belza, PhD Candidate University of Cincinnati ASCSA Corinth Museum Project Volunteer
Fall 2020–Spring 2021
Project: Alice Leslie Walker Kosmopoulos, repatriation of Prehistoric material from the National ... should go through the objects ... In total we sorted through ... Road East material and |
|
|