[Agora Report] 2005 Excavations: Preliminary Report on the 2005 Excavation Season

John McK. Camp II ... Excavations were carried out in three sections in the summer of 2005: BZ, BH and Γ. In section BZ, mostly Roman levels were excavated, dating from the 1st to the 5th centuries A.D. Much more of the north-south ... 13 Jun-5 Aug 2005 ... revealing a series of hydraulic

icon

[Agora Report] 2019 Excavations: Agora 2019 - Summary Report

John McK. Camp II ... Excavations were carried out in four sections: in Section ΝΝ in the southwest corner of the archaeological site, and in the northwest corner of the Agora in Sections ΒΖ, ΒΘ East and ΒΘ West. Section ΝΝ ... 10 Jun-2 Aug 2019 ... that the tank was hydraulic

icon

[Agora Report] 2006 Excavations: Preliminary Report on the 2006 Excavation Season

John McK. Camp II ... This summer the 75th anniversary of the beginning of the excavations and the 50th anniversary of the reconstruction of the Stoa of Attalos were celebrated. Excavation were concentrated on two areas: northwest ... 13 Jun-4 Aug 2006 ... itself, more of the hydraulic

[Corinth Report] Nezi Field 2007 by J. Matthew Harrington and Theodora Kopestonsky (2007-05-21 to 2007-06-08): Early Roman to Modern periods in the area north of Nezi field

Excavation Summary During the third training session of the 2007 season, we, J. Matthew Harrington and Theodora Kopestonsky, conducted excavations in the area north of the Nezi field for a total of fourteen ... the hydraulic complex. To

[Corinth Report] Nezi Field 2013 by Mohammed Bhatti and Daniel P. Diffendale (2013-05-09 to 2013-05-10): 2013 Session 1, Team Pink, Final Summary

Mohammed Bhatti and Daniel P. Diffendale Team Pink, Session 1 Nezi Field Excavations Final Report N 1006 – 1018.00; E 261.01 – 271.28 1–25 April 2013 This is a final summary of the first season of excavation ... layer” mortar for a hydraulic

[Corinth Report] Nezi Field 2009 by Jody Cundy and Dina Boero (2009-06-19 to 2009-06-20): Pink Final Summary