|
Excavation Summary
During the third training session of the 2007 season, we, J. Matthew Harrington and Theodora Kopestonsky, conducted excavations in the area north of the Nezi field for a total of fourteen ... and Bothros 7 (NB228). The descriptions of earlier excavations ... of Bothros 7 (NB228 - |
Luke Madson and Jesse James, Session III 2022 (May 30 - June 24)
Excavation Summary:
This excavation took place from May 30 to June 17, 2022, during the third excavation session of the season. It continued ...
Area Description:
The ... measures approximately 0.7m N-S ... length of 1.7m and drop of |
INTRODUCTION
For three weeks, I, Heidi Broome-Raines, worked in the area designated “North of Nezi,” conducting cleaning operations and new excavation. The baskets for which I am responsible are B 5001-5082 ... between 282.7 E to the east and ... descriptive names, pending further ... large pit, “Bothros 7,” which |
An Jiang, Catharine Judson
2016 Corinth Session I
South Stoa Excavation, Shop 1 Rear
Coordinates: N: 1092.3, S: 1084.7, E: 355.9, W: 349.6
Excavation Dates: April 5-21, 2016
Introduction
This is ... 1092.3, S: 1084.7, E: 355.9, W: ... corner, E: 351.8, N: 1084.7; SE ... 7.1 and 27) and by the |
This excavation was undertaken from May 30-August 13, 2016 in the area of the planned new apotheke of the ASCSA’s Corinth Excavations. As the excavation permit requires, the primary objective was to reach ... neighboring Room 7), may point ... below for a description of ... Plan). It consists of Rooms 7 |
Katie Rask, Marty Wells
ASCSA Corinth Excavations
End of Season Report
Blue Team
North of Nezi
The following is a summary of the excavations carried out in the area north of Nezi field during the 2009 ... detailed description of our ... with 7mm screens and 3mm ... of 6556/7. The |
Anna Belza, PhD Candidate University of Cincinnati ASCSA Corinth Museum Project Volunteer
Fall 2020–Spring 2021
Project: Alice Leslie Walker Kosmopoulos, repatriation of Prehistoric material from the National ... Heer 7, etc.). In some ... went to the ASCSA Apotheke7 ... descriptions. The lotting process is |
Nezi 2013 Season
Session 3 Final Report
Grace Erny and Emily Joy
N 1005.89 – 1022.92; E 255.66 – 271.22
27 May – 21 June 2013
This is the final report for the third session of excavation at Nezi, 2013 ... report.
Area 1: 27 May – 7 ... description of the later 6th |
|
|