|
Kelly E. O’Connor and Catherine A. Uritis
Corinth 2022 Session II (5/9/22- 5/27/22)
27 May 2022
Northeast of Theater, Trench 19B, Session II Final Report
Elevations of Identified Road Levels in 19B South ... NET Trench 19B, Session II Final Report |
Danielle Smotherman
Temple E, Southeast Excavations
Session I
Unit 2, Room 2
N: 1066.50 N, S: 1065.00 N, E: 119.27 E, W: 116.57 E
Unit 2, Room 9
N: 1086.73, S; 1079.10 N, E: 132.85 E, W: 126.83 E
21-28 ... since 1996 (NB888 P1-46). The ... 0.9 m, W. 1.35 m). Shortly ... (1066.60 N, 118.17 E, L. 1.6 m |
Danielle Smotherman
Timothy Brannelly
Temple E, Southeast Excavations
Session II
Unit 2, Room 9
N: 1086.73, S; 1079.10 N, E: 132.85 E, W: 126.83 E
4-22 May 2015
2015 Session II, Frankish activity in Unit ... L. 1.87 m., W. 1.0 m., D ...
2015 Session II, Frankish ... since 1996 (NB888 P1-46). The |
Stephanie Kimmey and Jennifer LaFleur
Session 1
TESE Excavations, NW Passage
N: 1073.00 N; S: 1058.07 N; E: 108.91 E; W: 94.00 E
April 7-May 3, 2014
This is the final summary of excavation ... Temple E, Southeast, context 1 |
Introduction:
This is the final report for the first session of excavations in the 2015 season for Rooms 4 and 6 of Unit II in the area of Temple E SE. Room 4 was last excavated by A. Rohn in July and ... 0.45 m. The depth is unknown ... Snyder, Barnes, Zervos 1998, p. ... 117.30-116.03E) 1.18 m long x 0.40 m |
Sarah Rous, Rebecca Worsham
Session I
Temple E Southeast Excavations
N: 1087 N, S: 1075.25 N, E: 129 E, W: 116.5 E
6–25 April 2014
Introduction
This is the final summary of the first session of excavation ... Unit II, Room 6 and Room 8, Session I |
Katie Rask, Marty Wells
ASCSA Corinth Excavations
End of Season Report
Blue Team
North of Nezi
The following is a summary of the excavations carried out in the area north of Nezi field during the 2009 ... every 0.30 m. This was our ... p. 35, 61-27-1, 61-27-2, ... 1961 (NB 229, p. 109) and |
Bram ten Berge, Katerina Ragkou
Session II
Temple E Southeast Excavations (TESE)
N: 1071.69 S: 1058.97 E: 103.11 W: 94.50
May 5, 2014 – May 26, 2014
Introduction
This is the final summary of the ... diameter of the vault is 1.08 m, while its height is 0.68 m. ... chamber are 1.76 m (l.) x 1 |
|
|