Danielle Smotherman
Temple E, Southeast Excavations
Session I
Unit 2, Room 2
N: 1066.50 N, S: 1065.00 N, E: 119.27 E, W: 116.57 E
Unit 2, Room 9
N: 1086.73, S; 1079.10 N, E: 132.85 E, W: 126.83 E
21-28 ... Temple E, Southeast 2015 by Danielle Smotherman (2015-04-21 to 2015-04-30) |
Introduction:
This is the final report for the first session of excavations in the 2015 season for Rooms 4 and 6 of Unit II in the area of Temple E SE. Room 4 was last excavated by A. Rohn in July and ... Final Report Unit 2, Rooms 4 and 6. Session I 2015 |
N-S 1074.64-1071.50; E-W 125.50-122.70
Session 2-3 Final Report, June 27, 2014
This is the final report of the second and third sessions during the 2014 excavations in the church nave in Unit 2 of the ... 835, B62, p. 111-112; burial ... 125.50-122.70
Session 2-3 Final ... the church nave in Unit 2 |
Dreya Mihaloew, Katie Rask, Marty Wells
ASCSA Corinth Excavations
North of Nezi
Session 2: April 27 – May 22, 2009
Session 2 excavations were carried out from April 27th to May 15th in the area north ... End of 2nd session, 2009 |
Danielle Smotherman
Timothy Brannelly
Temple E, Southeast Excavations
Session II
Unit 2, Room 9
N: 1086.73, S; 1079.10 N, E: 132.85 E, W: 126.83 E
4-22 May 2015
2015 Session II, Frankish activity in Unit ... 2015 Session II, Frankish activity in Unit 2, Room 9 |
Bram ten Berge, Katerina Ragkou
Session II
Temple E Southeast Excavations (TESE)
N: 1071.69 S: 1058.97 E: 103.11 W: 94.50
May 5, 2014 – May 26, 2014
Introduction
This is the final summary of the ... Roads and Courtyard of NW Passage, Session 2 |
Room 8 [N: 1088.00 N, S: 1077.00 N, E: 129.00 E, W: 121.00 E]
Room 7 [N: 1086.30 N, S: 1078.20 N, E: 123.90 E, W: 119.40 E]
Rodríguez-Álvarez, Emilio
Session III
Introduction:
This is the final report ... Corinth Report: Temple E Southeast excavations. Unit 2, Rooms 8 and 7. |
Kelly E. O’Connor and Catherine A. Uritis
Corinth 2022 Session II (5/9/22- 5/27/22)
27 May 2022
Northeast of Theater, Trench 19B, Session II Final Report
Elevations of Identified Road Levels in 19B South ... (Potential paved road) 58.95
2 ... wall 30) 60.12
4 (Thin road, cut for wall 30 |
|
|