| John McK. Camp II ... Excavations were carried out in three areas: in Byzantine levels over the Painted Stoa in Section ΒΘ; at the north end and beneath the Classical Commercial Building in Section ΒΖ; and in Section ΟΟ in ... 8 Jun-31 Jul 2015 ... was a varied and productive ... from the 14th century B.C. to the 12th century A.D. |
EXCAVATION SUMMARY
Six weeks ago, on April 10, 2007, we, Lydia Herring, Josh Langseth, and Kris Lorenzo, opened an excavation area at the extreme north of the Nezi field under the supervision of Guy Sanders, ... Nezi Field, context 25 |
EXCAVATION SUMMARY
We, Angela Ziskowski and Lina Kokkinou, from May 21 to June 9 2007 continued the excavation in the northern edge of the Nezi field, in the same excavation area opened by Lydia Herring, ... B226, a small oval depression ... = B 191) a pit or well ... B142 were done.
A small |
INTRODUCTION
In the past three weeks, we, Lydia Herring, Josh Langseth, and Kris Lorenzo, opened an area at the extreme north of the Nezi field under the supervision of Director of Excavation Guy Sanders ... Nezi Field, context 25 |
Kelly E. O’Connor and Catherine A. Uritis
Corinth 2022 Session II (5/9/22- 5/27/22)
27 May 2022
Northeast of Theater, Trench 19B, Session II Final Report
Elevations of Identified Road Levels in 19B South ... NET Trench 19B, Session II Final Report |
INTRODUCTION
For three weeks Ioannis Sapountzis worked in the area designated “North of Nezi,” conducting cleaning operations and new excavation. The area where cleaning and excavation took place is located ... excavating them, B5110 revealed a ... 5141. Since B5141 had a middle ... that B5105 was a foundation |
Corinth Report: Northeast of Theater excavations, Trenches 15B and 14B, by Taylor Cwikla, Allisen Hunter (May 9 – May 27)
Collection: Corinth
Type: Session Summary
Context: NET Context 26, NET Context ... Northeast of Theater excavations, Trenches 15B and 14B |
Danielle Smotherman
Temple E, Southeast Excavations
Session I
Unit 2, Room 2
N: 1066.50 N, S: 1065.00 N, E: 119.27 E, W: 116.57 E
Unit 2, Room 9
N: 1086.73, S; 1079.10 N, E: 132.85 E, W: 126.83 E
21-28 ... 24 P27; NB888 B25 P28). It was ... research and development of a ... goal was to find a |
|
|