[Corinth Basket] NB84 B165 P106

Basket/zembil 84 165 106 West Lane III, north section West Lane III = north section ca. 0.40-0.60 [NB 85 p. 99 CWB:] III 0.50-0.60 LM III painted 4 (1 is. 3 maybe LM II LM II “ ... LH III ... p. 99 CWB:] III ... (1 is. 3 maybe LM II LM II “ 11

[Corinth Basket] NB83 B109 P35

Basket/zembil 83 109 35 House B II After we had gone down a depth of 27 cm we found a flooring within the house, 10 cm below this one we found a sec. flooring. A third floor was found 10 cm lower and ... 1916/06/26 ... [p. 38] II 25-35 Sec ... House B II ... flooring within the house, 10 cm

[Corinth Basket] NB83 B171 P54

Basket/zembil 83 171 54 North Alley IV IV = 60-80 [MN for levels III-V: very poor sherds] [NB 85 p. 55, CWB:] IV 0.60-0.80 LM III painted 6 LM II 1 black 1 buff ... LH III? ... -0.6

[Corinth Basket] NB83 B161 P50

Basket/zembil 83 161 50 Room N of M, NW section VI (=M VI) Went down level VI 90-110. Poor sherds, several painted sherds of LM I. [NB 85, p. 68, CWB:] VI 0.90-1.10 LM II-I ? 9 Light on ... LH I ... NB83 B161 P50

[Corinth Basket] NB84 B192 P122

Basket/zembil 84 192 122 East Alley, under wall We dug out lower level in E Alley under the diag. Wall. [NB 85, p. 52 CWB:] East Alley under Diagonal Wall [0.55 crossed out] 0.70-1.45 [MN: (0.70-1.45)] ... LH II ... LH II

[Corinth Basket] NB114 P33: Terracotta Factory, Court

114 33 Court, near door to cooridor, square 2Q (1930 Plan: p. 128-129) Court, Square 4P (1930 plan, NB 108: 128-129), 20-30 cm. below wall, Deposit 4 Terracotta Factory, deposit 4: from court, halfway ... ca. 350-325 B.C. (Stillwell and Benson 1984, Corinth 15.3, p. 211) ... April 3, 1930. (II, p. 43, l ... April 3, 1930. (II, p. 43, l ... Court, near door to cooridor, square 2Q (1930 Plan: p. 128-129)

[Corinth Basket] NB84 B166 P106

Basket/zembil 84 166 106 West Lane IV, north section West Lane IV ca. 0.60-0.80 (north section) Further digging in West Lane. In north section at a depth of 0.65 to 0.80 we found in an area of loose ... 1916/07/24 ... -0.6

[Corinth Basket] NB83 B108 P35

Basket/zembil 83 108 35 House B I B House [sketch of House B] We dug out the little house formed by four walls within the space between the south wall, east wall and second connecting wall. See plan ... LH I-II ... wall. See plan p. 2. This ... flooring within the house, 10 cm ... floor was found 10 cm lower