|
During the first training session of the 2008 season, we conducted excavations for fifteen days between April 7 and April 23, 2008.We worked with Thanasis Notis (pickman), Billy Papanikolao (shovelman), ... some fill and a retaining ... the area between Walls ... between the area north of Wall |
North of Nezi (Green) Report End of Season 2009: Will Bruce (until 25 May), Scott Gallimore (until 1 June), Karl Goetze (from 25 May), Dan Leon (from 1 June)
The following summarizes the results of excavations ... fills, a wall foundation, and ... area was to expose the walls ... by removing wall 5508, |
Room 8 [N: 1088.00 N, S: 1077.00 N, E: 129.00 E, W: 121.00 E]
Room 7 [N: 1086.30 N, S: 1078.20 N, E: 123.90 E, W: 119.40 E]
Rodríguez-Álvarez, Emilio
Session III
Introduction:
This is the final report ... between 23rd and 25th of April ... between the 19th and the 21st ... between the 5th of May and the |
Sarah Lima
Session 3
End of Season Report
15 June, 2009
Between the dates of May 25, 2009 and June 15, 2009 (Session III), our excavation team comprised of Sarah Lima (recorder), Panos Kakouros (pickman), ... between the wall sections 6300, ... fill 6616 for wall 5519, ... June, 2009
Between the dates |
We, Joseph Lillywhite, Joel Rygorsky, Matthew Sears and Martin Wells, continued excavation in the entirety of Nezi Field from May 5 – June 13th, 2008. This report will summarize our own findings, while ... property boundary wall ... this structure (wall 243) ... period.
Two fills, 408 and |
Session III
Unit 2, Room 9
N: 1086.73, S: 1079.10, E: 132.85, W: 126.83
Unit 2, Room 6
N: 1085.00, S: 1077.00, E: 120.70, W: 116.85
This is the final summary of the third excavation session for 2015 in ... this narrow mouth and the original
cavity was then backfilled up to the height of the mouth. Some of the fill ... was built with a foundation trench and a layer of foundation stones wider
than the face of the wall above. The foundation trench for this wall (cut 673, fill ... above seems to have been the same width as these foundations, making it
difficult to distinguish between the foundations and the visible wall |
Katie Rask, Marty Wells
ASCSA Corinth Excavations
End of Season Report
Blue Team
North of Nezi
The following is a summary of the excavations carried out in the area north of Nezi field during the 2009 ... room between walls W55 on ... back-filled, while other areas were ... and back-filled.
In the |
North of Nezi 2010
White Second Session Report (John Tully)
The following summarizes the results of excavations in two areas north of Nezi field during the second session of the 2010 excavation season ... south side of Wall 5631 as continuing under the wall, and to ... and cutting-back that |
|
|