|
Luke Madson and Jesse James, Session III 2022 (May 30 - June 24)
Excavation Summary:
This excavation took place from May 30 to June 17, 2022, during the third excavation session of the season. It continued ... layer. 1.74m of the drain’s ... interior point is ca. 1.25m ... stone is 0.79m tall and 1.22m |
Danielle Smotherman
Temple E, Southeast Excavations
Session I
Unit 2, Room 2
N: 1066.50 N, S: 1065.00 N, E: 119.27 E, W: 116.57 E
Unit 2, Room 9
N: 1086.73, S; 1079.10 N, E: 132.85 E, W: 126.83 E
21-28 ... 2015 Session I, Late Byzantine - Early Frankish activity in Unit 2, Room 2 and |
Final Report: Excavations of South Stoa, Shop 1 Rear, Session 2 2016
Alexandra Daly and Thalia Parr
DATES OF EXCAVATION: May 4-20 2016
COORDINATES: N: N 1090.40; E: E 353.95; S: N 1084.70; W: E 349.60 ... Final Report: Excavations of South Stoa, Shop 1 Rear, Session 2 2016 |
Danielle Smotherman
Timothy Brannelly
Temple E, Southeast Excavations
Session II
Unit 2, Room 9
N: 1086.73, S; 1079.10 N, E: 132.85 E, W: 126.83 E
4-22 May 2015
2015 Session II, Frankish activity in Unit ... L. 1.87 m., W. 1.0 m., D ... since 1996 (NB888 P1-46). The ... 733/717/726/747, L. 5.7 m, W. 3.1 m, N. |
Alison Fields and Jessica Lamont
Team White, Session 3
Nezi Field Excavations Interim Report
Area 1: N-S 1016.05-1011.70, E-W 274.18-278.91
Area 2: N-S 1009.51-1005.94, E-W 278.90-271.47
May 27-June 14 ... 1.34 m. D, the fill of this ... at H 86.28 m. in ... began at H 87.21 m. in |
Stephanie Kimmey and Jennifer LaFleur
Session 1
TESE Excavations, NW Passage
N: 1073.00 N; S: 1058.07 N; E: 108.91 E; W: 94.00 E
April 7-May 3, 2014
This is the final summary of excavation ... measured 1.13 x 0.40 x 0.19m ... courtyard is a 1.87m deep bothros ... 83G; B. 81, NB 839, p. 139); |
Katie Rask, Marty Wells
ASCSA Corinth Excavations
End of Season Report
Blue Team
North of Nezi
The following is a summary of the excavations carried out in the area north of Nezi field during the 2009 ... every 0.30 m. This was our ... p. 35, 61-27-1, 61-27-2, ... 1961 (NB 229, p. 109) and |
N-S 1074.64-1071.50; E-W 125.50-122.70
Session 2-3 Final Report, June 27, 2014
This is the final report of the second and third sessions during the 2014 excavations in the church nave in Unit 2 of the ... height of 1.7 m. Dental health ... measures 0.38 x 0.20 m. A number ... 1.38 m, W. 0.30) consists of |
|
|