|
Final Report: Excavations of South Stoa, Shop 1 Rear, Session 2 2016
Alexandra Daly and Thalia Parr
DATES OF EXCAVATION: May 4-20 2016
COORDINATES: N: N 1090.40; E: E 353.95; S: N 1084.70; W: E 349.60 ... in a 1.00 x 0.50 m area) ... 3.85 x 0.75 m area). This ... in a 2.60 x 0.35 m area). |
Wesley Bennett and Lucas Stephens
Session II
Temple E Southeast Excavations
Corridor North of Church: 1075-1078.5 N, 121.5-129.5 E
Room 6: 1077-1085 N, 116.85-120.7 E
04-22.05.2015
This is the summary ... 2015 Session II, Corridor N of Church and Room 6 |
Kelly E. O’Connor and Catherine A. Uritis
Corinth 2022 Session II (5/9/22- 5/27/22)
27 May 2022
Northeast of Theater, Trench 19B, Session II Final Report
Elevations of Identified Road Levels in 19B South ... NET Trench 19B, Session II Final Report |
Introduction:
This is the final report for the first session of excavations in the 2015 season for Rooms 4 and 6 of Unit II in the area of Temple E SE. Room 4 was last excavated by A. Rohn in July and ... 0.45 m. The depth is unknown ... Snyder, Barnes, Zervos 1998, p. ... 117.30-116.03E) 1.18 m long x 0.40 m |
Danielle Smotherman
Temple E, Southeast Excavations
Session I
Unit 2, Room 2
N: 1066.50 N, S: 1065.00 N, E: 119.27 E, W: 116.57 E
Unit 2, Room 9
N: 1086.73, S; 1079.10 N, E: 132.85 E, W: 126.83 E
21-28 ... since 1996 (NB888 P1-46). The ... excavated in Session II ... during Session II.
Unit 2, |
Alison Fields and Jessica Lamont
Team White, Session 3
Nezi Field Excavations Interim Report
Area 1: N-S 1016.05-1011.70, E-W 274.18-278.91
Area 2: N-S 1009.51-1005.94, E-W 278.90-271.47
May 27-June 14 ... at H 86.28 m. in ... began at H 87.21 m. in ... 1.34 m. D, the fill of this |
Danielle Smotherman
Timothy Brannelly
Temple E, Southeast Excavations
Session II
Unit 2, Room 9
N: 1086.73, S; 1079.10 N, E: 132.85 E, W: 126.83 E
4-22 May 2015
2015 Session II, Frankish activity in Unit ... 2015 Session II, Frankish activity in Unit 2, Room 9 |
Mohammed Bhatti and Daniel P. Diffendale
Team Pink, Session 1
Nezi Field Excavations Final Report
N 1006 – 1018.00; E 261.01 – 271.28
1–25 April 2013
This is a final summary of the first season of excavation ... an area of ca. 1.5 x 3 m. ... Daniel P. Diffendale
Team ... Mohammed Bhatti and Daniel P. |
|
|