| John McK. Camp II ... Excavations were carried out in three sections in the summer of 2005: BZ, BH and Γ.
In section BZ, mostly Roman levels were excavated, dating from the 1st to the 5th centuries A.D. Much more of the north-south ... 13 Jun-5 Aug 2005 ... I/18,J/11-1/20,2/15 ... J/8,20-1/5,2/6 |
| John McK. Camp II ... All the work during the season 2004 was concentrated on the northwest corner of the Agora north of the Panathenaic Way.
In BZ North, the last remains of Byzantine fills and walls were removed and Hellenistic, ... 7 Jun-16 Jul 2004 ... I/20,J/10-1/18,2/13 ... J/8,20-1/7,2/9 |
FINAL REPORT: EXCAVATIONS OF SOUTH STOA, SHOP 2 REAR, SESSION 1 2016
Alexandra Daly and Thalia Parr
Dates of Excavation: April 5 – April 22
Coordinates: N: 1090.40 N, S: 1085.50 N, E: 351.40 E, W: 345.20 ... EXCAVATIONS OF SOUTH STOA, SHOP 2 REAR |
Danielle Smotherman
Temple E, Southeast Excavations
Session I
Unit 2, Room 2
N: 1066.50 N, S: 1065.00 N, E: 119.27 E, W: 116.57 E
Unit 2, Room 9
N: 1086.73, S; 1079.10 N, E: 132.85 E, W: 126.83 E
21-28 ... activity in Unit 2, Room 2 and Frankish fill in Unit 2, Room 9 |
Final Report: Excavations of South Stoa, Shop 1 Rear, Session 2 2016
Alexandra Daly and Thalia Parr
DATES OF EXCAVATION: May 4-20 2016
COORDINATES: N: N 1090.40; E: E 353.95; S: N 1084.70; W: E 349.60 ... Final Report: Excavations of South Stoa, Shop 1 Rear, Session 2 2016 |
Bram ten Berge, Katerina Ragkou
Session II
Temple E Southeast Excavations (TESE)
N: 1071.69 S: 1058.97 E: 103.11 W: 94.50
May 5, 2014 – May 26, 2014
Introduction
This is the final summary of the ... associated with Unit 1.
After the ... shops of Unit 1.
The ... 1 and 2, in an area |
Luke Madson and Jesse James, Session III 2022 (May 30 - June 24)
Excavation Summary:
This excavation took place from May 30 to June 17, 2022, during the third excavation session of the season. It continued ... ); Dressel 2-4 with dipinto, 1 ... Spanish Dressel 2-4, 1st cent ... from May 30th to June 2nd we |
Kelly E. O’Connor and Catherine A. Uritis
Corinth 2022 Session II (5/9/22- 5/27/22)
27 May 2022
Northeast of Theater, Trench 19B, Session II Final Report
Elevations of Identified Road Levels in 19B South ... upon further examination
1 (Potential paved road) 58.95
2 ... paved road (1) running |
|
|