[Corinth Report] Temple E, Southeast 2014 by Larkin Kennedy and Jody Cundy (2014-05-06 to 2014-06-27): Sessions 2-3 of 2014: Church Nave, Unit 2 of the Frankish Quarter

N-S 1074.64-1071.50; E-W 125.50-122.70 Session 2-3 Final Report, June 27, 2014 This is the final report of the second and third sessions during the 2014 excavations in the church nave in Unit 2 of the ... Sessions 2-3 of 2014: Church Nave, Unit 2 of the Frankish Quarter

[Corinth Report] Nezi Field 2013 by Kate Larson and Jon Meyer (2013-05-27 to 2013-06-18): Session 3 2013 Blue Northwest Nezi Field, Early/Middle Roman to Frankish Periods

Kate Larson and Jon Meyer ASCSA Corinth Excavations Blue Team Session 3 Final Report N :1016.50 N, E: 263.00 E, S: 1005.70 N, W: 255.50 E May 27 – June 18, 2013 During Session 3 2013, the Blue Team excavated ... Excavations Blue Team Session 3 ... 2013 During Session 3 2013, ... excavated during Session 3 2012

[Corinth Report] South Stoa east 2016 by An Jiang and Catharine Judson (2016-04-05 to 2016-04-21): South Stoa Shop I Rear

An Jiang, Catharine Judson 2016 Corinth Session I South Stoa Excavation, Shop 1 Rear Coordinates: N: 1092.3, S: 1084.7, E: 355.9, W: 349.6 Excavation Dates: April 5-21, 2016 Introduction This is ... 1092.3, S: 1084.7, E: 355.9, W: ... E: 353.85, N: 1092.3; NW ... entire area. On March 3, he

[Corinth Report] Temple E, Southeast 2015 by Danielle Smotherman and Tim Brannelly (2015-05-04 to 2015-05-22): 2015 Session II, Frankish activity in Unit 2, Room 9

Danielle Smotherman Timothy Brannelly Temple E, Southeast Excavations Session II Unit 2, Room 9 N: 1086.73, S; 1079.10 N, E: 132.85 E, W: 126.83 E 4-22 May 2015 2015 Session II, Frankish activity in Unit ... since 1996 (NB888 P1-46). The ... type that date AD 1250-78 ... 733/717/726/747, L. 5.7 m, W. 3.1 m, N.

[Corinth Report] Temple E, Southeast 2014 by Stephanie Kimmey and Jennifer LaFleur (2014-04-07 to 2014-04-28): Final Summary, Session I (NW Passage)

Stephanie Kimmey and Jennifer LaFleur Session 1 TESE Excavations, NW Passage N: 1073.00 N; S: 1058.07 N; E: 108.91 E; W: 94.00 E April 7-May 3, 2014 This is the final summary of excavation ... (Deposits 78, 88, and 100: Lot ... 83G; B. 81, NB 839, p. 139); ... (NB 880, p. 79), a second