INTRODUCTION
In the past three weeks, we, Lydia Herring, Josh Langseth, and Kris Lorenzo, opened an area at the extreme north of the Nezi field under the supervision of Director of Excavation Guy Sanders ... series of tree pits and ... individual tree pits but not joining a specific tree pit |
North of Nezi 2010
White Second Session Report (John Tully)
The following summarizes the results of excavations in two areas north of Nezi field during the second session of the 2010 excavation season ... owing to a tree in the SW ... deposit nearest the tree, may ... were complicated by a tree |
EXCAVATION SUMMARY
Six weeks ago, on April 10, 2007, we, Lydia Herring, Josh Langseth, and Kris Lorenzo, opened an excavation area at the extreme north of the Nezi field under the supervision of Guy Sanders, ... tree pits and irrigation ... side of individual tree ... other tree pits within the |
This is the final report for the area excavated by the green team in Temple East – Southeast during the first session of excavation of 2014. Guy Sanders (director) and Jody Cundy (field director) supervised ... to preserve a pine tree ... tree, only the southwestern ... If the tree can be removed |
EXCAVATION SUMMARY
We, Alexis Belis and Christina Gieske, from April 7-26, 2008, began excavation in the northwest area of Nezi Field that was located west of the 2007 Nezi Field excavations. Our portion ... smaller ones.
A tree pit ... is likely that the tree |
Rob Nichols, Marty Wells
Corinth Excavations 2010
North of Nezi
We, Rob Nichols and Marty Wells, commenced excavation in the area north of Nezi during the first session of the 2010 Corinth excavation season, ... somewhat by the large tree root |
Mohammed Bhatti and Daniel P. Diffendale
Team Pink, Session 1
Nezi Field Excavations Final Report
N 1006 – 1018.00; E 261.01 – 271.28
1–25 April 2013
This is a final summary of the first season of excavation ... for an orange tree (context |
|
|