|
Kelly E. O’Connor and Catherine A. Uritis
Corinth 2022 Session II (5/9/22- 5/27/22)
27 May 2022
Northeast of Theater, Trench 19B, Session II Final Report
Elevations of Identified Road Levels in 19B South ... max. depth of 3 m. The ... has a width of 1,07 m. Road ... 2,12 m from the eastern |
Luke Madson and Jesse James, Session III 2022 (May 30 - June 24)
Excavation Summary:
This excavation took place from May 30 to June 17, 2022, during the third excavation session of the season. It continued ... (ca. 3.4m below current ... 0.12–0.35m in length) and bonded ... James, Session III 2022 (May |
Danielle Smotherman
Temple E, Southeast Excavations
Session I
Unit 2, Room 2
N: 1066.50 N, S: 1065.00 N, E: 119.27 E, W: 116.57 E
Unit 2, Room 9
N: 1086.73, S; 1079.10 N, E: 132.85 E, W: 126.83 E
21-28 ... excavated in Session II. ... during Session II.
Unit 2, ... 118.60 E, L. 3.2 m, W. 0.23 m |
Final Report: Excavations of South Stoa, Shop 1 Rear, Session 2 2016
Alexandra Daly and Thalia Parr
DATES OF EXCAVATION: May 4-20 2016
COORDINATES: N: N 1090.40; E: E 353.95; S: N 1084.70; W: E 349.60 ... Session II. The fill of the ... reopened in Session II.
The ... 3.85 x 0.75 m area). This |
Wesley Bennett and Lucas Stephens
Session II
Temple E Southeast Excavations
Corridor North of Church: 1075-1078.5 N, 121.5-129.5 E
Room 6: 1077-1085 N, 116.85-120.7 E
04-22.05.2015
This is the summary ... 2015 Session II, Corridor N of Church and Room 6 |
Katie Rask, Marty Wells
ASCSA Corinth Excavations
End of Season Report
Blue Team
North of Nezi
The following is a summary of the excavations carried out in the area north of Nezi field during the 2009 ... every 0.30 m. This was our ... 1961 (NB 229, p. 109) and ... 6th, 1961 (NB: p. 182), as |
This excavation was undertaken from May 30-August 13, 2016 in the area of the planned new apotheke of the ASCSA’s Corinth Excavations. As the excavation permit requires, the primary objective was to reach ... .97 m. The fill of this ... 12th century phase.
Room 3 ... Central House
Rooms 12, 13, |
Sarah Lima
Session 3
End of Season Report
15 June, 2009
Between the dates of May 25, 2009 and June 15, 2009 (Session III), our excavation team comprised of Sarah Lima (recorder), Panos Kakouros (pickman), ...
During Sessions II and III, we ... Lattimore and Berg (NB 229, p. ... III, we began our |
|
|