|
During the second and third sessions of the 2008 season at Corinth, a contingent of Team Green excavated to the W of a 1960s-excavated courtyard within the greater area of North of Nezi. The area of excavation ... E-W wall to the S. There ... expanded as far as 267 E. The ... 1035 N by 265 E. It |
Anna Belza, PhD Candidate University of Cincinnati ASCSA Corinth Museum Project Volunteer
Fall 2020–Spring 2021
Project: Alice Leslie Walker Kosmopoulos, repatriation of Prehistoric material from the National ... Apotheke.
12 Weinberg, S. S. ... at Corinth (e.g ... time) stored within: e.g |
Kate Larson and Jon Meyer
ASCSA Corinth Excavations
Blue Team Session 3 Final Report
N :1016.50 N, E: 263.00 E, S: 1005.70 N, W: 255.50 E
May 27 – June 18, 2013
During Session 3 2013, the Blue Team excavated ... 259.80 E, S. 1014.25 N, W ... 264.20 E, S. 1003.70 N, W ... (N. 1016.50 N, E. 263.00 E |
Room 8 [N: 1088.00 N, S: 1077.00 N, E: 129.00 E, W: 121.00 E]
Room 7 [N: 1086.30 N, S: 1078.20 N, E: 123.90 E, W: 119.40 E]
Rodríguez-Álvarez, Emilio
Session III
Introduction:
This is the final report ... Temple E, Southeast |
Katie Rask, Marty Wells
ASCSA Corinth Excavations
End of Season Report
Blue Team
North of Nezi
The following is a summary of the excavations carried out in the area north of Nezi field during the 2009 ... bones (e.g., of fish, cats, ... dumps of roof tiles (e.g ... important features (e.g., he |
Stephanie Kimmey and Jennifer LaFleur
Session 1
TESE Excavations, NW Passage
N: 1073.00 N; S: 1058.07 N; E: 108.91 E; W: 94.00 E
April 7-May 3, 2014
This is the final summary of excavation ... Temple E, Southeast 2014 by Stephanie Kimmey and Jennifer LaFleur (2014-04-07 to |
Session III
Temple E Southeast
2-27 June 2014
This is the final summary of the third and final session of excavations for the 2014 season in the north area of Unit 2 in the Frankish quarter, Temple E ... Temple E, Southeast |
An Jiang, Catharine Judson
2016 Corinth Session I
South Stoa Excavation, Shop 1 Rear
Coordinates: N: 1092.3, S: 1084.7, E: 355.9, W: 349.6
Excavation Dates: April 5-21, 2016
Introduction
This is ... 1092.3, S: 1084.7, E: 355.9, W: ... 1106.511; S 1086.5; E 356.4; W ... associated finds (e.g. obsidian |
|
|